Cabs – Budiriro Infrastructure Development – Old Mutual Properties.

 

 Graders take a break at an infrastructure development project in Budiriro Phase 5, Harare.

 A 22 tonne Excavator Hyundai LC3-210 (left above) is loading excess material onto a tipper truck for dumping while on the (right) a tipper
truck is seen off-loading excess material at a designated dump site.

 

Scope of works.
 Land clearing and stripping,
 Rock blasting and waste disposal,
 Anthill excavation and waste disposal,
 Fill material on rock excavations , excavated anthills and reclamation of disused sand pits
 Sand pits rehabilitation,

Project Details

  • Category: Road construction
  • Location: Budiriro Phase 5, Harare.