a) Construction of a pump house at Chitora Irrigation Scheme
b) Rehabilitation and upgrading of a sewer pond in Headlands.
Rehabilitation of sewerage system Mazowe
Civil Engineering Works – Bulk Earthworks, Stone Cladding, Storm Water Drainage And 80mm Interlocking Pavers.
Fairview Phase 1 Civil Works – Reconstruction Of Roads And Storm water Drainage – Work In Progress.
Construction Of Stormwater Drainage – 600mm Diameter Piped Subsurface Stormwater Drainage In Ventersburg, Sunway City And A Concrete Lined Open Drain The picture above show a haulage truck...
◼ Ground excavation and preparation, ◼ Installation of 2.65Km x 110mm & 90mm MPVC pipes
◼ Water reticulation ◼ Road construction ◼ Stormwater drainage